Published: 28 September 2015
Labour Only needed Bathroom.Need bathroom prepared for installation of new shower, toilet, vanity. Lift ply and replace to level floor for shower box. Prepare floor for tiling Hot water Cupboard - remove and replace Gib Board Kitchen - repair hole in celiing.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
We were very pleased with the results of the work completed at our rental property which included re-gibing walls, removal of cupboards, patching a hole in a ceiling, plastering and priming walls for painting. Jon was able to accommodate the work to fit with our timetable, when additional work was requested he completed that immediately for us. He was very easy to deal with and we fully intend to use his services again. We highly recommend him. Many thanks.
Work carried out by the owner/operator
Reviewed on 29-10-2015
#1 | Tradie 1 | No recent reviews | 58 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 18 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 17 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 6 jobs | No longer in contact |
Partner with Builderscrack
Get work