KITCHEN 1) Flooring - Tile floors. Old floor needs removing, 2 layers of lino and a layer of MDF like material glued to the Chip board. Needs to be prepared for tile underlay to go down before new kitch can be installed. 2) Walls - Re-gib & plaster. Walls clear, just Gib to be stuck to the studs, approx 6 sheets. Size is approx 5sqm
Workmanship |
5.0
|
Really good job done, Terry was more than happy to come back when and as required until job was completed. Excellent job.
Reviewed on 24-05-2009
Tradesperson reply
"great client to work with, good communication.Thanks."
Partner with Builderscrack
Get work