The part of the house (outside) where the hot water cylinder is housed needs the panelling replaced, and on one side a door to be made and fitted. Also the hot water cylinder existing wrap is to be replaced with new.
Workmanship |
1.0
|
Cost |
5.0
|
Schedule |
3.0
|
Communications |
3.0
|
Had to cut a second panel as the first one didn't fit properly at the bottom. The second panel wasn't cut correctly at the top, and doesn't fit into the frame as well as the first.
Work carried out by the owner/operator
Reviewed on 24-11-2020
Partner with Builderscrack
Get work