Published on 6 March 2025
Particle board floor was damaged by water and need to be replaced with plywood. I bought the plywood for the work but need a handyman or carpenter to replace the damaged board (area is 1.2x2.8m) for me. Some of battens may need replacing as well.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Eric help me with replacing water damaged timber floor in a bedroom. He responded promptly and completed the job with very high quality.
Work carried out by the owner/operator
Reviewed on 13 March 2025
Partner with Builderscrack
Get work