Job 1 The old Hotwater cupboard the kitchen needs 3-4 shelves to provide more storage in the kitchen. This job needs to be useful rather than too pretty and expensive. I would like white coated shelving. and the interior of the cupboard painted. You will need to work around the existing pipe. Job 2 During the recent storm one of the posts of the 1.8 fence partially broke at the base. I need this post resupported. Job 3 The drawer is from the bathroom vanity and needs to be screwed/nailed/glued together Job 4 This is at another property in Ham east. The gates need a bit cut off the bottom to allow them to swing easily.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Could have tidied up a little better after doing the job.
Work carried out by the owner/operator
Reviewed on 12-07-2022
Partner with Builderscrack
Get work