Published: 8 June 2020
A non-structural cinder block stairwell platform needs to be demolished. We have built a new deck over the platform. It sits half outside and half inside. Access is from outside and from inside the garage. We are a split level home so access from the garage is easy. Cost is to demolish only and dispose of concrete. Use of your own tools. Measures about 1.5m (d) x 2m (w) x 1.8m (h)
#1 | Tradie 1 | No recent reviews | 77 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 16 jobs | No longer in contact |
#3 | Tradie 3 |
|
85 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 50 jobs | No longer in contact |
Partner with Builderscrack
Get work