6m x 6m shed and approx 12m x 6m section to driveway needs digging out (approx 200mm topsoil) then filling with appropriate levels of sand and gravel and compaction (as appropriate). Also require small "sinkhole" area for drainage from shed downpipe, to meet building permit requirements. Landowner to liaise with suppliers of gravel/sand. Topsoil to be dumped on-site, approx 20m from shed site.
Workmanship |
3.0
|
Cost |
4.0
|
Schedule |
3.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 29-11-2011