Active job

Reno Ensuite and Replacing Windows

Job image
Job image
Job image
Job image
Job image
Job image
Job image

Job description

General Handyman Tasks
Far North

Ensuite Bathroom 306cm x 210cm wet area on concrete floor. Wet wall lining in shower only. Rest of bathroom walls to be gibbed and plastered. Install overhead shower and reposition shower slide. Remove shower curtain rail and install a by folding shower door. S-bend toilet to be replaced with wall hung toilet suite. Custom built vanity and shelves. New ceiling heat lamp. Install dbl power point. Replace lino. Wood frame around bathroom window needs replacing. Bathroom will be stripped. 2 rooms that need windows replaced. One room needs to be cut to size. Outside cladding is ply and batten. I have aluminium windows for both rooms.


Trade professionals

#1 Tradie 1 No recent reviews 28 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo