I need about 4 metres of guttering and a downpipes installed (including materials. I also need a number of rotten weatherboards replaced. About 4 metres as well and about 6 replaced I think. I also need the scribes replaced.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Fantastic person to deal with. really good operator.
Work carried out by the owner/operator
Reviewed on 02-10-2021
Partner with Builderscrack
Get work