I have some signage to be displayed behind glass. It is in existing joinery. Note there are two sides, so two pieces of glass to be popped and reinstalled. This is for a new public artwork and needs to be completed by 16-17 June. (The current bus stop / signage is being relocated 13 June).
Partner with Builderscrack
Get work