Review

Removal of shop front glass door and wall and re-installing

Job image
Job image
Job image
Job image

Job description

General Glazing
Auckland

Ellerslie Drycleaners require the shop front glass and aluminium door frames to be removed, to make way for a large machine to gain access, and then put back together again. Ideally, the removal of the doors and frames should be done the evening before, and then the re-installing of the same should be done the day after. May need the co-ordination between a glazier and a carpenter. Securing the shop front with strong timber boards overnight also required. Job to be done around mid to late August


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Right from the start, it was clear the contractor, Vance, knows what he's doing. I think he is more than just a glazier, he is very efficient with carpentry work as well. The job was not simple, because other contractors I asked were unsure of how to go about it. Yet Vance made the job look easy, and he completed within budget as well. 5 stars out of 5.

Work carried out by the owner/operator
Reviewed on 21-09-2019

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo