I need my new gas hob plumbed in and ready for gas connection, dont have gas water heating at this stage only the hob. i need this done by the 11th of September if at all possible. I would prefer the gas bottle be located on the opposite side of the house so the gas line run will be approximately 8 meters long.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent efficient job
Work carried out by the owner/operator
Reviewed on 15-11-2023
Partner with Builderscrack
Get work