Published on 12 May 2014
we have an old gas oven that we are replacing with a new (to us) Westinghouse gas oven/hob. This needs to be installed on around 26 May 2014. Ideally old oven taken away. Also a check of our gas flued heater is also required.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
excellent communication and did a great job - above and beyond scoped and expected but still within budget. thank you
Work carried out by the owner/operator
Reviewed on 26 June 2014
#1 | Tradie 1 | No recent reviews | 36 jobs | Secured job |
Partner with Builderscrack
Get work