We require the installation of a new gas hob, which will replace the electric hob in an existing kitchen. There is no gas currently in the house. The work will involve the installation of a new hob and all associated pipework, (approx 5.0m), plus outside connection for one 9kg gas bottle. (gas hob and bottle supplied by us). The outside connection is on a brick veneer wall. Floors are concrete. Thanks
#1 | Tradie 1 |
|
65 jobs | No longer in contact |
#2 | Tradie 2 |
|
146 jobs | No longer in contact |
#3 | Tradie 3 |
|
55 jobs | No longer in contact |
#4 | Tradie 4 |
|
167 jobs | No longer in contact |
Partner with Builderscrack
Get work