We are looking to have our hot water system converted to continuous gas. The house is already connected to the gas network, as we have gas powered central heating. We would want the mains pressure hot water cylinder disconnected and removed as part of this job. Work can start from 27 June onwards.
#1 | Tradie 1 |
|
17 jobs | No longer in contact |
#2 | Tradie 2 |
|
192 jobs | No longer in contact |
#3 | Tradie 3 |
|
13 jobs | No longer in contact |
Partner with Builderscrack
Get work