Published: 26 February 2020
We have a 26 l/min Bosch external gas heater connected to our ensuite. We need it connected to replace our existing electric cylinder which serves the rest of the house - another bathroom, kitchen, laundry and hand basin. The old cylinder needs to be fully disconnected and emptied so that I can remove it. Completion before winter is desirable but not essential. All plumbing connections are in the roof, except for the electric cylinder.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 03-04-2020
Partner with Builderscrack
Get work