Review

New Gas Hot Water System

Job description

Hot Water System
Christchurch

We currently have a low pressure hot water cylinder and are looking to have a continuous gas hot water system installed. Something that does around 27L/m. Ideally we would like this to be done in the next month or two.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo