New kitchen to be installed in approximately 5 weeks. Require: Phase One All services disconnected in 2.5 weeks to enable removal of old kitchen. Disconnect taps and dishwasher. Phase Two Install of new kitchen in approx 5 weeks. Move dishwasher position (only by about 600-mm), establish connection and install waste disposal, install new mixer tap. Gas Hob Currently considering a gas hob however will need to be run off a bottle. Would like a guide to cost of installing a gas line 2 m under a wooden floor to carport where bottle can be kept. Also the cost of installing and connecting the hob.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 42 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 13 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work