current HWC is under the stairs. There is a gas bayonet beside where the new gas HW system is to be placed.This is 4 meters from the kitchen on same floor. Two bathrooms one upstairs. for removal of HWcylinder. Will need power point.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
extremely fine workmanship from the team, went out of their way, used top quality materials ( as opposed to cheaper products offered by more expensive quotes). Went the extra mile, good follow up when we had a minor problem. Extremely neat work, looking very professional. recommend very highly. Andreas even adjusted my gas hob. Great guys.
Work carried out by the owner/operator
Reviewed on 11-05-2020
#1 | Tradie 1 |
|
252 jobs | Secured job |
#2 | Tradie 2 |
|
120 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 66 jobs | No longer in contact |
Partner with Builderscrack
Get work