We are building a pool and the green grass around the pool needs to be cleared to a minimum of 2m around the pool. A weedeater would do the trick. The greenwaste can be left onsite in a neat pile outside the cleared area. It needs to be completed before Tuesday 6th
Partner with Builderscrack
Get work