On the subfloor, the piles have a large steel rod which should be bent down over the bottom plate framing and secured with U nails. The steel rods are still facing up and should be better secured. Having this undertaken should be a straightforward task for a builder. This job must be performed by a qualified builder or the job can be verified by a qualified builder.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Dave is professional and patient. The job is well done according to the NZ standard. Definitely recomanded. Thanks very much! Have a nice Christmas, Dave!
Work carried out by the owner/operator
Reviewed on 24-11-2022
Partner with Builderscrack
Get work