Review

Connect piles to the bearers

Job image
Job image
Job image

Job description

House Piling
Wanganui

From the builders report - Piles are supposed to be connected to the bearers in the subfloor by way of a stapled wire or the like. No pile to bearer connections were sighted in the sub floor area. Where practical, we recommend the retrofitting of adequate pile connections (approx. 40), fitted by a suitably qualified professional. If possible, a joint quote for the above and below, and then a separate quote for each (in case we can only do one part now). The brick foundation at the rear of the dwelling (in the area of the wood-burner) is beginning to fail, and this is likely to compromise the structure including the wall and roof above it.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Edgar was great to work with, communication was easy and he worked with our budget. The quote was super easy to get as well, which we appreciated. I'm not going under the house to check the work but I'm sure it's good quality! I would definitely consider going to Edgar again in the future. Thanks!

Work carried out by the owner/operator
Reviewed on 22-09-2023

Verified Builderscrack review

Trade professionals

#1 Tradie 1
42 jobs Secured job
#2 Tradie 2
215 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo