Have a 60m2 flat which needs the floor re-leveled by way of Jack and Pack of some of the existing piles. Also one pile requires lowering.
#1 | Tradie 1 |
|
1 job | No longer in contact |
#2 | Tradie 2 |
|
110 jobs | No longer in contact |
Partner with Builderscrack
Get work