There is a ramp to the childcare which has subsided as both structures are built upon peat. There is now a gap between the ramp and the building. Foundation needs sorting and then some minor repairs to the ramp will be required
Workmanship |
3.0
|
Cost |
4.0
|
Schedule |
2.0
|
Communications |
2.0
|
Work was done to an agreed standard and price. Job delayed initially as tradesman arrived with all the materials needed ! Returned the following weekend and got the job done
Work carried out by an employee of the company