Active job

Timber pile foundation (with concrete footings)

Job image
Job image
Job image
Job image

Job description

House Piling
Rotorua

The job is to construct a timber pile foundation for a shed structure, including:    - measuring and marking out the positions of the piles    - drilling the holes for the piles    - placing the piles in the holes and bracing them Piles:    - 34 cantilever piles in total    - Ø150mm diameter    - SED H5    - lengths vary roughly between 2m and 3.5m Holes for concrete footings:    - Ø600mm diameter    - depth vary roughly between 1.5m and 2m We supply the piles. Site access is easy. Extensive earthworks have been carried out recently. The shed site is close to level now (cut and filled). Timeframe We would prefer the job to be finished before mid March. The sooner the better. Additional info Please see the attached images for all the details, including detailed plans and photos of the building site. Thank you.


Trade professionals

#1 Tradie 1
109 jobs No longer in contact
#2 Tradie 2
2 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo