Tightening relocated house

Job image

Job description

Foundation Underpinning
Rodney

1-Hold Downs Required for the Relocated house Supply materials and labour to connect 85 ordinary piles and 9 Anchor piles , replace 1 x bearer. 2-Baseboard Supply materials and labour to attach 150 x 25 base boards to the perimeter of the building approx 250m and missing weather boards approx 70m. 3-New Deck Supply materials and labour for approx 108m2 of deck around 3 sides of the house.140 x 35 pine decking nailed , 1 x stairs , 1 day for digger to drill holes , 3 m3 of concrete for piles


Trade professionals

#1 Tradie 1 No recent reviews 0 jobs No longer in contact
#2 Tradie 2
62 jobs No longer in contact