A wall in the basement of the church needs to be underpinned because excavations (unplanned/unknown reason) have undermined the wall. Excavations have been undertaken to the front of one of the subfloor walls, at the toe of the wall and cutting close to vertically straight down for approximately 800mm at the deepest excavation point on the eastern side of the church to approximately 200mm at the western side of the church.
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work