Old piles have been removed from under the house and holes have been dug. New wooden piles are under the house ready to be installed (concreted and underpinned) and I believe the house is level. I would need someone to install the new piles and make sure the house is level and to an adequate height. The property is approximately 140sqm.
#1 | Tradie 1 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work