Our 1970s kitchen/lounge requires leveling as we need to install a new kitchen. Not sure if some piles need 'cutting' down or if some need re-doing. some of the floor is raised or it could be the piles next to it have moved down? We have a wall being removed as part of the reno so one of the piles will need a base added for more loading. Need a quote first and availability/eta to complete the job.
Partner with Builderscrack
Get work