We need 5 holes dug under our house, depth 600cm. Posts and bracing to be completed. Access is tight but you can get access under the house. Engineer and soil analysis done. Plan is available and supervised by the engineer. Start date ASAP
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job by Wesley and team, all completed in a timely way and great communication along the way. I can't quite believe he managed to dig the holes for the piles in such a confined space. Good value for money and a relief to get this sorted.
Work carried out by the owner/operator
Reviewed on 24-05-2022