Total repile and levelling of an old villa. Approximately 90 piles and 10 bearers as per attached drawings and PS1. Work excludes lifting rear deck. Full design can be provided on request.
#1 | Tradie 1 |
|
109 jobs | No longer in contact |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 |
|
33 jobs | No longer in contact |
#4 | Tradie 4 |
|
24 jobs | No longer in contact |
#5 | Tradie 5 |
|
23 jobs | No longer in contact |
Partner with Builderscrack
Get work