Active job

Re-aligning of house piles

Job description

House Piling
Kapiti Coast

The house was re-piled at some stage with concrete piles and wedge-packing. Builder's report says "The piles have not been tied correctly to the bearers. The wire straps are not looped over the bearers and may pull of in an earthquake." This will be a two person job as the house is built close to the ground (building inspector said this is fine, as long as there are two people present).


Trade professionals

#1 Tradie 1
9 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo