Hi there, I'm keen to have a quote on this issue: The soil has been removed from the perimeter of a number of pile footings. The soil gives support to the pile below ground and anchors it in place. This is stated on the building report :Recommend installing a new treated timber --- pile besides the piles to give improved stability in the event of an earthquake.
#1 | Tradie 1 |
|
18 jobs | No longer in contact |
#2 | Tradie 2 |
|
23 jobs | No longer in contact |
#3 | Tradie 3 |
|
27 jobs | No longer in contact |
#4 | Tradie 4 |
|
8 jobs | No longer in contact |
#5 | Tradie 5 |
|
18 jobs | No longer in contact |
Partner with Builderscrack
Get work