looking for the driven pile foundation as per the plan. this is for the build on 2 town houses on the pile foundation. the piles need to be at least 900mm above ground.
#1 | Tradie 1 |
|
27 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work