Active job

Extra pile

Job description

House Piling
Horowhenua

I would like an extra pile put in. I had work dome to replace the floor under the shower. It was found that the previous twice removed in putting in the show cut in to one of the longer beams meaning over a period of 30 year plus one half of this beam has began to sage. I was informed by the individual who did the floor replacement that he could jack up the saying beam and then brace it to other existing beams. These number of months layer I have my doubts and if I think an extra pile is required


Trade professionals

#1 Tradie 1
111 jobs No longer in contact
#2 Tradie 2
15 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo