2 x Rib Raft slabs to complete from boxing through to concrete supply and placing. both jobs are side by side so ideally both would be prepped and done together. please send a msg/email and all drawing info can be sent.
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work