Active job

Cottage needs solid and level foundation

Job description

House Releveling
Dunedin

I have a 107m2 cottege which has only been about one third replied. The rest of the house is now a bit wonky and needs replied as well as leveled if possible. The house is quote low to the ground in places. I am open to suggestion about going under the house or through the floor but prefer the repairs to be timely as well as as least intrusive as possible. I am happy to organise any concent that may need to take place.


Trade professionals

#1 Tradie 1 No recent reviews 0 jobs No longer in contact
#2 Tradie 2 No recent reviews 3 jobs No longer in contact
#3 Tradie 3
4 jobs No longer in contact
#4 Tradie 4 No recent reviews 20 jobs No longer in contact
#5 Tradie 5 No recent reviews 1 job No longer in contact
#6 Tradie 6 No recent reviews 10 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo