Repair poor workmanship on post-eq repair based on Kotahi Engineering plan. Investigate 'spring' in floorboards of one room. Easy, walk on access, and 1.75m clearance in main area of work. Engineer has indicated that application for exemption from consent is feasible. Work with owner to secure this. Kotahi report available as a pdf ( unable to attach below).
#1 | Tradie 1 |
|
51 jobs | No longer in contact |
#2 | Tradie 2 |
|
51 jobs | No longer in contact |
#3 | Tradie 3 |
|
5 jobs | No longer in contact |
Partner with Builderscrack
Get work