Require installation of SPC Flooring (similar to laminated flooring). Plus minus 30 sq. meter area, including hallway (see photo 1), plus 1 toilet and 1 room. (Also require removal of old carpet (green one) currently in place and if possible, carpet disposal). Will require finishing off the border between carpet and flooring panels in doorways adjacent to rooms/hallways with metal strips/transition bars. See photo 2-3 . End of hallway has a few steps to be included and finished off at edges (see last photo). I only have the floor panels with 'underlay', metal strips/transition bars to be supplied if possible. Job to be completed asap.
Partner with Builderscrack
Get work