Existing Rimu floor with waterbased poly, we are wanting the poly sanded off as we are laying a engineered flooring over the top by glue down method. Approx 80-90 m2. Hoping to get it done Wednesday 10/4/19 first thing. Short notice I know but maybe...
#1 | Tradie 1 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work