Hi, I’ve pulled up one layer or vinyl however there appears to be a couple more layers under that which I don’t want to touch as it might be asbestos. I would like to level the floor on top of this to a point where we could put down our SPC flooring
#1 | Tradie 1 |
|
23 jobs | No longer in contact |
#2 | Tradie 2 |
|
43 jobs | No longer in contact |
#3 | Tradie 3 |
|
0 jobs | No longer in contact |
Partner with Builderscrack
Get work