Job part1 : Remove white tiles from floor in kitchen area and small hallway - sand or prep ready for new flooring. wooden particle subfloor. Need to move central island bench. Job part2: Remove grey tiles from a bathroom and small foyer, and stair landing. These were installed incorrectly directly onto particle board so are lifting already except on a half of the bathroom and the stair landing which is concrete. See photos Additonal work may be required after these initial stages such as floor leveling, repair or replacement of job2 sub floor if needed. Other building work or floor installation a possibility.
#1 | Tradie 1 | No recent reviews | 17 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
73 jobs | No longer in contact |
Partner with Builderscrack
Get work