I'm converting a 20 foot non operating refigerated container into a food processing room. I'd someone to lay and fix plywood sheets onto the floor of the container ready for fibreglassing. The floor is made up alloy ribs which the ply can be fixed to. The container has 1 internal wall installed and the container needs to have 2 drains cut out of the floor. There need to be a section cut into the floor and lined to form a foot bath. It should take about 5 hours.
#1 | Tradie 1 | No recent reviews | 4 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 39 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 14 jobs | No longer in contact |
#4 | Tradie 4 |
|
211 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 31 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 0 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 12 jobs | No longer in contact |
#8 | Tradie 8 |
|
15 jobs | No longer in contact |
Partner with Builderscrack
Get work