Kitchen vinyl plank flooring is cracked where floor construction changes from concrete to timber. Vinyl and carpet need to be lifted, crack on the concrete sealed and perhaps underlay required - and vinyl and carpet put back in place. 4-5m2 of vinyl to be replaced.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 11-10-2023
Partner with Builderscrack
Get work