Published on 23 November 2022
Wooden floor from second hand wood. Needs to be put in and treated. Underground is chip board. Roughly 70m2. Flexible on timing, January or February.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
1.0
|
Communications |
4.0
|
Good job but the job took way longer than expected (2 weeks vs 2 months). Overall very happy with the result.
Work carried out by the owner/operator
Reviewed on 17 April 2023