Published on 7th December 2023
The ensuite and the bathroom toilet cubicle have had some flooring replaced. The ensuite has had a new toilet and shower installed , and the bathroom a new toilet. New vinyl needs to be laid. I have the new vinyl.
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"I thoroughly recommend this tradesman. I will use him again for any more one off jobs."
Work carried out by the owner/operator
Review posted by Robyn on 3rd January 2024
"Thank you , it was a pleasure."
9th January 2024
Verified Builderscrack review
Partner with Builderscrack
Get work