Need flood damaged cork tiles removed , concrete floor prepped and laminate floor laid . 10m x 3 m .Need job done asap as house is about to go on the market. Easy access.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Thoroughly recommended
Work carried out by the owner/operator
Reviewed on 17-03-2023
Partner with Builderscrack
Get work