Review

Floor preparation and laminate floor install

Job image
Job image

Job description

Laminate & Floating Flooring
Manukau

Clear residual tile glue in some areas, prep concrete floor and install laminate flooring. 45 square metre space, 12-15 square meters of area requiring tile glue removal. Space will be clear and new kitchen installed December 2nd. Work to commence from 3rd December.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Really outstanding job, the prep work and advice was exceptional. The tradies on sight managed to communicate well with limited English fluency, but their admin team have excellent comms’. Very impressed.

Work carried out by an employee of the company
Reviewed on 11-03-2021

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo