Tiling to be done on the sunroom floor, including 3 steps. 1. Going towards the kitchen 2. Going towards lounge 3. At the entrance plus surrounding area.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 27-05-2019
Tradesperson reply
"Thanks."
Partner with Builderscrack
Get work