We have 40 sqm of timber to be installed. Timber is on site and ready for installation. Previous tiles have been removed and most of glue that affixed them also removed. There is a small amount of residue glue that probably requires removal prior to laying.
#1 | Tradie 1 |
|
23 jobs | No longer in contact |
#2 | Tradie 2 |
|
10 jobs | No longer in contact |
#3 | Tradie 3 |
|
10 jobs | No longer in contact |
#4 | Tradie 4 |
|
25 jobs | No longer in contact |
#5 | Tradie 5 |
|
2 jobs | No longer in contact |
#6 | Tradie 6 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work